Projects
Our projects
Floor preparation across food and beverage, warehousing, retail and healthcare — for contractors, builders and facility managers.

Sector A · 3 projects
Food & Beverage
Commercial kitchens, food processing facilities and cold storage need floors that handle moisture, thermal shock and aggressive cleaning. We prepare substrates for MMA, polyurethane and epoxy systems rated for these demanding environments.
Brisbane
Cold storage facility
Floor prep for a polyurethane screed: shot blasting to CSP 4, crack repair and a moisture barrier.
| Area | 2,400 m² |
| Programme | Night works over 2 weeks |
Gold Coast
Food processing plant
Existing coating removal and recoat preparation: diamond grinding, joint repair and falls correction for drainage.
| Area | 1,800 m² |
| Programme | Staged during production shutdowns |
Sydney CBD
Commercial kitchen
Tile removal and substrate prep for MMA flooring, ready for coating by 6 am each morning.
| Area | 350 m² |
| Programme | 3 overnight shifts |
Sector B · 3 projects
Warehousing & Logistics
Distribution centres and warehouses need floors that withstand forklift traffic, racking loads and constant wear. We prepare large floor areas efficiently with ride-on equipment.
Acacia Ridge
Distribution centre
New warehouse floor prep: grinding to CSP 3, joint stabilisation and levelling compound.
| Area | 8,500 m² |
| Programme | 2 weeks, on schedule |
Melbourne West
Logistics hub
Existing floor remediation: crack injection, spall repairs and re-sealing preparation.
| Area | 12,000 m² |
| Programme | Staged in an operating facility |
Brisbane Airport
E-commerce fulfilment centre
Floor levelling for automated systems, with QA documentation for the equipment installers.
| Area | 4,200 m² |
| Result | SR2 across the entire floor |
Sector C · 3 projects
Retail
Shopping centres and retail tenancies demand fast turnarounds and minimal disruption. We work nights and weekends to keep centres trading while preparing floors for new tenants.
Westfield Chermside
Major retailer fit-out
Complete strip-out and relevel: tile removal, adhesive grinding, moisture barrier and self-levelling compound.
| Area | 1,200 m² |
| Programme | 5-day turnaround |
Pacific Fair
Shopping centre common areas
Terrazzo preparation, with surfaces protected by 5 am for trading.
| Area | 3,500 m² |
| Programme | 3-week rolling, nights only |
Queen Street Mall
Multi-tenancy strip-out
Sequential strip-outs and floor prep for vinyl across six tenancies, with dust control for neighbouring businesses.
| Area | 2,800 m² |
| Scope | 6 tenancies |
Sector D · 2 projects
Healthcare
Hospitals, clinics and aged care facilities require strict infection control and minimal disruption. We plan and stage works so the facility keeps running throughout.
Brisbane
Hospital ward refurbishment
Vinyl replacement prep with full containment, HEPA extraction and staged works room by room.
| Area | 800 m² |
| Result | No disruption to adjacent wards |
Sunshine Coast
Aged care facility
Carpet removal and floor levelling, scheduled around resident activities with quiet equipment in occupied areas.
| Area | 1,500 m² |
| Programme | Around resident routines |
Get a quote
Have a project to discuss?
We aim to respond to every enquiry within one business day. For urgent projects, call us directly.
| Phone | 07 3467 4990 |
| admin@apexprep.com.au | |
| Hours | Mon–Fri 6am–4pm · after-hours works available |
| Yard | 347 Macdonnell Road, Clontarf QLD 4019 |